Wednesday, August 27, 2008
Tuesday, August 26, 2008
This past week has been quite eventful. Some major accomplishments this week include: drying in the roof as well as successfully passing an inspection from Cache County regarding the exterior. The shingles were delivered this past week along with the siding. The building has been wrapped with a weather resistant barrier. Western Mechanical finished up all their flues and put caps on the roof flues. A significant amount of work has been accomplished in the area of trenching and laying the conduit for electric utility, Comcast, and Qwest for the entire subdivision. Our future short term goals would include the scheduled 4 way inspection with cache county Thursday the 28th and we hope to start insulation by the first of September.
Tuesday, August 19, 2008
It is exciting when you realize how much has been accomplished since the first week in April 2008 when we first broke ground on this project. On phase 1A, all of the underground water and sewer lines are installed and tested. Almost all of the curb and gutter are in. We have started to install the electric, telephone, and gas utilities now also. Legrand-Johnson was here today finalizing the paving plan for the streets that will be started by the end of August. We are now 10 weeks into the construction of building #144 and are nearing our 4-way inspection with the County by mid next week. Take a look at the slide show and you can see how the building is taking shape with the roof "dried-in" and the windows installed. Note that all the photos documenting progress with past slide shows are kept and available to review via a dated link on this page for reference.
Thursday, August 7, 2008
The Photos and Major Milestone dates reported on this post should help everyone involved evaluate the project status and help them schedule and plan their work without driving to Elk Mountain.
Interested parties can upload a .pdf file of the drawing of a particular building. Files are organized by the building number, For example; Elk mtn #144 is a 6-plex, and building #150 is a 4-plex. Please make sure you download the correct set of plans for the project you are providing a quote for.
Interested parties can upload a .pdf file of the drawing of a particular building. Files are organized by the building number, For example; Elk mtn #144 is a 6-plex, and building #150 is a 4-plex. Please make sure you download the correct set of plans for the project you are providing a quote for.
Wednesday, August 6, 2008
About Elk Mountain
Elk Mountain Town Homes are located in a rustic community situated three miles from recreational activities on stunning Hyrum Reservoir or minutes from shopping and the arts in nearby Logan. Elk Mountain is located at the intersection of 300 South and 1300 East in Hyrum, Utah. Elk Mountain includes easy access to Logan, USU, cultural and sporting events, restaurants and shopping. Nearby recreation activities include Hyrum Reservoir, Hardware Ranch, Beaver Mountain Ski Resort and Bear River.